Skip to main content
Request access

Your lease, your next question

Buying the freehold: get the group evidence together

Your own lease is a useful starting point. A freehold purchase also needs evidence about the building, other leases and the people taking part. Prepare those questions before asking an adviser to assess eligibility.

For flats in England and Wales. You can copy the starter question straight away. Adding your own notes is optional.

Copy into LEASE-iQ

Start with this question.

  1. Copy the question.
  2. Open LEASE-iQ and choose your uploaded lease.
  3. Paste it into the question box, then check the cited pages.
Open LEASE-iQ ↗

Ready to copy.

One residential lease is free, with no one-month limit. Request free access first. After confirmation, follow the secure upload instructions. Requesting access does not create an account automatically.

Nothing is sent automatically. Choose a question for another issue →

Add details if you have them.

Your entries update the question above. Leave unknown details blank; the question asks for them to be checked.

Add notes about your situation
Mark the documents you have

A tick means you have the document. It does not mean it has been uploaded to or checked by LEASE-iQ.

Read and copy my question ↑

These notes stay in this page while it is open. This page does not save or send them. Leave out names, addresses, title numbers and personal details.

Check the answer with the documents open.

Use this personal checklist while reading the answer in LEASE-iQ. Ticking it does not verify the answer or give legal approval.

Check 1

One lease cannot establish whether the whole building or group qualifies.

Check 2

Keep the total flats, qualifying leaseholders and participants as separate figures.

Check 3

Record how areas were measured and which titles, leases or participant details are still missing.

Take the next step.

Share a document list with the group, then ask a specialist solicitor and valuer to assess the route, participation, structure and costs. Get permission before circulating another person’s documents.

Questions to take to an adviser

Nothing is sent from this page.

Sources and scope

Collective enfranchisement has separate building, leaseholder and participation conditions under the 1993 Act. This worksheet does not test them. Use current guidance and have the building-specific position checked before taking formal action.

Sources checked 10 October 2026. General preparation guidance; not advice on your particular lease. Check the current position before acting.